Meghmani Residence

Project Overview

Project:

Meghmani Residence - Duplex Penthouse, 36th & 37th Floor

Scale:

Complete Interior Execution (Civil, MEP, HVAC, Automation, Furnishing & Finishes)

Client:

Rajat Tibrewal - Private Residence

Configuration:

Duplex Penthouse · 1 Basement + 1 Open Car Park

Durations:

26 months (October 2020 - December 2022)

Area:

1,997 sq.ft. Carpet · 2,222 sq.ft. Built-up · 3,126 sq.ft. Super Built-up

Location:

Picnic Garden Road, EM Bypass, Kolkata

A First-Hand Exposure to Multi-Disciplinary Execution

Meghmani Residence is a family residential project in which Rajat Tibrewal was personally involved throughout design coordination, vendor selection, procurement, execution monitoring and quality review – across a duplex penthouse spanning the 36th and 37th floors of a B+G+37 tower developed by Mani Group & Goenka Developers.

This project was not executed under Hindyug Group. It is presented solely to demonstrate the promoter’s practical, first-hand exposure to multi-disciplinary project execution — civil works, MEP, HVAC, automation, plumbing, electrical, specialist installations, finishes and vendor coordination – across a genuinely complex, multi-trade build.

Key features

A duplex spread across two floors, built for a large joint family, spanning every major residential discipline.

Two-Floor Duplex Layout

A floating staircase connects lower living, dining, kitchen, and guest suite to upper bedrooms, family lounge, study, terrace, and jacuzzi.

Full-Scope Execution

Delivered turnkey execution across civil, MEP, automation, and specialist finishes, seamlessly managing 20+ contractor teams over 26 months.

Premium Material Palette

Features six varieties of Italian marble, designer Sabyasachi wallpaper, and bespoke Century Ply Club Prime joinery in ICA finishes.

Project execution process

A rigorous, three-stage approach — design coordination through to final quality review.

Design Coordination

Working with the design team across floor planning, elevation drawings and ceiling plans for every major space - from Rajat's bedroom to the Master Bedroom suite - issued for execution with full side-by-side elevation sets (Sides A-D).

01

Vendor Selection & Procurement

Sourcing and coordinating over 20 specialist vendors and site contractors - from Italian marble suppliers to home automation integrators - matching each trade to the right specialist for a genuinely complex, multi-material build.

02

Execution Monitoring & Quality Review

On-site execution tracking across civil, MEP, HVAC, automation, plumbing and electrical works, with waterproofing verified prior to tiling/marble fixing and continuous quality checks through to final finishes.

03

Gallery

Space-by-Space Execution

Every room, coordinated in full from design intent through to final vendor sign-off.

Living, Dining & Foyer:

Inlay Italian marble foyer, bespoke Seven Designs furniture, Century Club Prime carpentry, & Schneider home automation integrated by BT Automation.

Kitchen & Pantry:

Modular Blu Kitchens setup with Häfele-Hettich hardware, Faber chimney, Samsung oven, LG refrigerator, and continuous Italian marble flooring.

Staircase & Double-Height Feature:

A steel-framed floating staircase with marble-clad treads and glass balustrade, connecting the 36th and 37th floors beneath a coffered false ceiling with mirror-fin wall panelling.

37th Floor Living, Study & Jacuzzi

Upper lounge with bespoke study, black-marble jacuzzi decking, and a Watteffects audiovisual setup featuring BenQ, ELAC, and Denon.

Puja Area:

Marble-panelled mandir with Mother of Pearl inlays, bespoke cabinetry, Lafit accent lighting, and seamless continuous marble flooring.

Guest Bedroom & Bath:

Sabyasachi wallpaper, Kohler & Jaquar Artize sanitaryware, custom wardrobe carpentry, and Italian marble bath cladding.

Master & Son's Bedrooms (Upper Floor):

Full elevation-drawn wardrobe and headboard walls, imported veneer panelling, Italian marble flooring, and en-suite bathrooms in Carrara-style marble with custom matte-lacquer vanities.

Open Terrace:

A landscaped deck with outdoor wood-finish tiling, a glass flooring section, and weatherproof Lafit lighting.

Building System

HVAC · Automation · Networking · Security

HVAC

Daikin VRV central system, 12 HP capacity, ducted across both floors. Contractor: Continental Cooling.

Home Automation

Schneider platform integrating lighting, HVAC & security (BT Automation)

Networking & WiFi

Grandstream devices, whole-home structured cabling (Intouch Networks)

Security

Hik Vision CCTV, integrated with the automation platform (BT Automation)

Water Systems

2× ZeroB Autosoft softeners, 2× KSB pressure pumps

Electrical Infrastructure

Schneider switches & fittings, Polycab wiring throughout

Everything You Need to Know

Complete interior execution - civil works, MEP, HVAC, home automation, plumbing, electrical, specialist installations and finishes, excluding the property itself.

26 months, from October 2020 to December 2022.

Over 20 specialist vendors and site contractors across marble, carpentry, electrical, plumbing, automation, AV, and finishes.